The Dorado field is an important development in the Australia energy landscape consisting of 150 mmbbls+. Discovered in 2018 as part of the greater Phoenix exploration.  The Dorado project is currently in the pre FEED (Front End Engineering and Design) phase, facilities are being designed for production of 75,000 to 100,000 barrels per day.

Carnarvon continues to unlock the potential of the Sub Bedout Basin and is planning to drill the Apus and Pavo prospects late 2021.